Skip to product information
1 of 2

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

Dynomite Diesel

DDP.AE-1

Accept Core Charge
$4,324.83

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California
Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

$4,324.83


Does it come with a warranty?

Any products listed will have a warranty provided by the manufacturer only. Stealth Diesel is not liable for any warranty. We can assist in warranty claims but we do not provide warranty on items we dont manufacturer. Most products have a 1 year warranty. For more information on warranty, reach out to us or the manufacturer for specific warranty details.

What happens if I have an issue?

We recommend reaching out directly to the manufacturer, but we are availble to assist with any issues or concerns for troubleshooting.

How fast is shipping?

Free ground shipping will be UPS ground, typically 5-7 business days or sooner. Expidited shipping is available on in stock products only.

What's the returns policy?

Most items are returnable unopened within 30 days of purchase. A stocking fee of 20% will be deducted for all returns. Items that are non-refundable are special order, custom made, powder coated, electrical or oversize items. Return shipping is at the expense of the buyer.

Questions about this product?
Don't be a stranger.