Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.
Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.
Details:
Liter: 7.3
Engine: Powerstroke
Years: 1999-2003
Fuel Type: Diesel
Condition: New
Not For Sale In California
Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel
$466.40
Any questions?
Address frequently asked questions about this product to minimize any concerns or uncertainties that might deter a customer from making a purchase.
Does it come with a warranty?
Any products listed will have a warranty provided by the manufacturer only. Stealth Diesel is not liable for any warranty. We can assist in warranty claims but we do not provide warranty on items we dont manufacturer. Most products have a 1 year warranty. For more information on warranty, reach out to us or the manufacturer for specific warranty details.
What happens if I have an issue?
We recommend reaching out directly to the manufacturer, but we are availble to assist with any issues or concerns for troubleshooting.
How fast is shipping?
Free ground shipping will be UPS ground, typically 5-7 business days or sooner. Expidited shipping is available on in stock products only.
What's the returns policy?
Most items are returnable unopened within 30 days of purchase. A stocking fee of 20% will be deducted for all returns. Items that are non-refundable are special order, custom made, powder coated, electrical or oversize items. Return shipping is at the expense of the buyer.
Questions about this product? Don't be a stranger.